On January 23, the author learned that the Jilantai Oilfield of the Bayan Branch of Huabei Oilfield has continuously deepened the efficient development management model of old oilfields,
On January 26, it was learned that the Tarim gas storage cluster, including the Yahe and Kokya gas storage facilities, has seen a continuous increase in gas production since the
On January 21st, the Wunan 3-2-13X well of the Tarim Oilfield was officially put into operation. This well successfully completed the lowering of the retrievable electric pump and achieved a qualified trial pumping within the middle of this month.
On January 5th, a reporter learned from the Oil and Gas Technology Research Institute of Jilin Oilfield that the Jilin Oilfield's intensive overall fracturing technology has focused on the capacity
On December 22, the author learned that the high-temperature heat pump system of the third thermal station, a key supporting project for the western transformation and upgrading of Jilin
As of December 21, the Tarim Oilfield has put 113 new wells into production this year, with a new crude oil production capacity of 1.0923 million tons and a natural gas production capacity of 2.234 billion cubic meters.
On December 14th, as the Qaidam Basin entered the severe cold season, the lowest temperature dropped to minus 15 degrees Celsius. The Qinghai Oilfield intensified its winter safety hazard
As of December 3rd, Daqing Oilfield, the world's largest research and production base for tertiary oil recovery, has achieved a tertiary oil recovery output of over 10 million tons in 2025, maintaining
On November 28th, it was learned that the Da'an 1H28-4 well, located in the Linjiang syncline of the Da'an block in western Chongqing, was successfully drilled. With a single run of rotary steering
On November 24th, the "laser rust removal + automatic anti-corrosion" integrated pipeline production line independently developed by Tiancheng Lide Company of Huabei Oilfield was successfully put into operation and has been running stably.